TitleProduct

Dovetail without Teeth Pre-buried Channel

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2021-12-29 06:00

  • Browse the number:

    430

Send an inquiries

Company Profile

Handan Maosheng Fastener Manufacturing Co., Ltd

By certification [File Integrity]

Contact:msjgj(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.bolt-ms.com/ http://msjgj.anjiesolar.com/

PRODUCT DETAILS

Material: carbon steel

Surface treatment: hot dip galvanized


Description of details: A variable radian catenary pre-embedded channel structure, comprising a dovetail channel arranged on a lining formwork, a number of anchors welded on the back of the dovetail channel, and a number of fastening mechanisms; the dovetail channel The dovetail groove is filled with polystyrene foam, and the lining template is provided with a number of bolt holes corresponding to the fastening mechanism and the dovetail groove of the dovetail groove, and two dovetail grooves with different radians are used to cooperate with each other. The fastening mechanism can fit the radian of the lining template well, so that the dovetail channel can be installed accurately.

For the part of the pre-embedded channel embedded in concrete, the structure of the embedded part of the embedded channel should avoid high temperature combustion as much as possible.

The exposed parts should be coated with anti-corrosion paint in time after welding

Reliable anti-vibration properties: Embedded steel toothed channels with different nuts adjust the looseness of the steel during the mechanical rotation of the production process, showing the key to various cement structures

Material's enhanced corrosion resistance stabilizes gravity and prevents rusting or cracking

 

About the installation method of Dovetail without teeth Pre-buried Channel

1. Confirm the product model to be used.

2, try to use standard length embedded parts. If cutting is required under special circumstances, the embedded part shall be cut to the required length, and the cutting point shall be 25mm away from the edge anchor.

3. Use nails to fix the embedded parts on the template through the positioning holes on the embedded parts, or fix the embedded parts on the positioning steel mesh, or use T-bolts to fix on the steel template with pre-drilled holes.

4. Formwork, pouring concrete. After the concrete curing period is over, disassemble the formwork.

5. Quickly pull the entire filling and sealing strip out of the notch.

6. Fix the components that need to be fixed on the embedded part.


Bolt installation method for Dovetail without teeth Pre-buried Channel

1. Select the corresponding bolt model according to the embedded part model.

2. The bolt head is inserted into the rail groove along the slotting direction and then rotated 90° clockwise, the T-bolt head is stuck in the groove.

3. Adjust the position of the bolts in the groove. Note that no bolts are allowed to be placed within 25mm from the edge of the embedded part.

4. Fixed anchor plate (or connector).

5. Fix the nut according to the torque requirements, and ensure that after the installation is completed, the "slot" at the end of the T-bolt screw should be perpendicular to the direction of the channel.


http://www.bolt-ms.com/