TitleProduct

Kaplan/ Propeller Hydro (Water) Turbine-Generator High Voltage 6.3kv / Hydropower / Hydroturbine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hunan

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-27 23:23

  • Browse the number:

    85

Send an inquiries

Company Profile

Hunan Sunny Hydropower Equipment Corporation

By certification [File Integrity]

Contact:Mr. Chris Zhou(Mr.)  

Email:

Telephone:

Phone:

Area:Hunan

Address:Hunan

Website: http://hunan-sunny.anjiesolar.com/

PRODUCT DETAILS
Propeller turbine-generator is with fixed runner, blade angle can not be changed during operation mode, the efficiency curve is steep and this turbine-generator is generally for power station that has water head with slight change or its operating units can be adjusted according to actual load change.

Kaplan turbine-generator is with adjustable runner controlled by oil servomotors and moved according to the load or head change to ensure higher average efficiency. Water head applicable: H=3m~30m.



Technical parameters:

Head(m): 3~25

Discharge(cubic meter): 2.26~82.8

Output(kW): 160~9000

Maximum efficency of model(%): 88~92.95
 Main Technical Parameters of tubular
Model Diameter of runner(cm) Water Head(m) Discharge(m/s) Output(kw) Maximun efficency of model(%)
ZDJP502 series 80-330 8-25 2.26-76 160-17520 92.5
ZZ/AD560 series 80-330 8-22 1.81-76.6 122-14710 88.3
ZZ/ZD560a series 80-330 6-15 1.72-67.5 88-8938 89
ZZ/ZD660 series 80-330 6-20 1.8-82.8 95-15100 92
ZZ/ZDT03 series 80-330 3-8 1.6-61.6 42-4350 89.9
ZZ/ZDK02 series 80-330 4-12 1.7-71.6 56-7670 93
ZZ/ZDK400 series 80-330 3-12 2.4-79.2 60-8390 92.95
 
1. Before making quotation, please send us the following basic parameters:
A. Flow------ m³/s
B .Water head----- m
C .Installed capacity--- KW
D. Frequency---- 50HZ or 60HZ
E. Length and diameter of the penstock
F. Voltage of the generator
G. Voltage of the transmission line(if the setup transformer is supplied by us ).
H. The quantity of the turbine-generator units
 
 
2.Please clearly note the follows in the quotation mail:
A.What is the scope of supply?
B.The hydroturbine-generator is controlled manually or automatically?